The work I did today was very
important if Jon and his family want to live in a house that does not lean one
way or another; if they want walls that are straight up and down.
Notice all the diagonal braces in
the garage. I started at the back corner and with my four foot level plumbed
the corner each way and braced it. Once you plumb one corner the two adjacent
ones will be plumb in one direction because of how the walls were laid out. You
always choose the top and bottom plates of the same length and the studs are
all the same length so you know the adjacent corner will be parallel and thus
plumb.
The diagonal brace holds the
interior garage wall plumb end to end, but there are several walls coming into
that garage wall that need to be checked. Also, if you sight down the wall it
needs to be straight. A tight string is often used to check for straightness.
Another job that is usually done at this time is to double plate the top of the
walls to strengthen then and tie them together. At the corners the plates overlap
each other to hold the adjacent wall corners together.
A view from the garage into the back
entry where there is a closet on the left and a door out to the patio. To the
right is the entry into the kitchen and dinette area. Notice that I have removed
the bottom plate from the doorways.
Straight ahead is the half bath. To
the left is the front entry and to the right is the back entry where we just came
in. All of these walls are now plumb both ways; end to end and sideways. Notice
that the double plate is missing from the wall on the right.
This is the front entryway. The top
plate is missing here also and the stairs are yet to be built; actually they
are built.
Here is the kitchen and dinette area
and is where I am working next. I am getting ready to build those stairs that I
said were already built.
That wall is yet to be built that
tie the two structures together. A new wall is needed because it will be a load
bearing wall. The stairs will take a day and that wall will take another day
and I have another day of work in the basement. That is three days and I have
three work days left before Jon comes home from vacation so I guess I had
better get back to work.