My brother, Jim, started the
electrical Friday afternoon, but at about the same time the heating contractor
backed out of the job. When he and Jon went to purchase the furnace, the
supplier was unable to sell the furnace to Jon because he was not a licensed
installer. The heating contractor was unable to purchase the furnace because he
was retired and his license was no longer valid. This presents us with a
problem because we need to start installation Monday to stay on schedule and we
now have to find another contractor who can do this job and start now.
Friday morning I laid out the
kitchen cabinets on the floor. Doing that allows the heating contractor, when
we find one, and the electrician to do their layout. The cans for the kitchen
lights are placed on the floor exactly below where they are to go in the
ceiling. Making two measurements for each can on the floor allows you to locate
exactly the can in the ceiling.
It is Saturday afternoon and Jon and
Rachael just got home from checking out cost of decking. They will order on
Monday. I will be ready to install as soon as we can get it.
It looks like Jon is giving me
directions, but he wasn’t. It was just a great conversation on our progress. I
was in the process of bonding the vapor barrier to the aluminum water shield. I
had just finished putting up the five wood strips on the deck ceiling to attach
the ceiling to.
From the back yard the addition
really looks nice. The roof is done, but we still need to put the vapor barrier
on the three peaks. The vapor barrier was not put on bottom side up; Lowe’s
simply printed our roll backwards.
This week I need to determine the
materials list for the window well and start work on it, but I will need to get
our tractor back.
David asked if he could use it for a
few days to move some dirt (soil). From my own experience with my tractor in
Texas, I know David had fun digging the hole. Going down the slope the weight
of the tractor allows one to easily fill the bucket. The operator then moves
his foot and move the direction peddle into the reverse position; the
hydrostatic transmission responds and the diesel engine provides the power to
back out the tractor with a full load in the bucket. Backing up the grade with
a full load and the sound of the engine gives the operator a really nice
feeling. It is a wonderful combination of man and machine. I suppose it is like
a high on drugs. You want to go in for another bucket full. Maybe that is why
the hole is so big.
He wants to remove about three feet
of earth from underneath the sunroom. He will probably remove the blocks, dig
out the earth, rebuild the wall, and replace the soil in the current hole. I
will keep you posted on this one.