First thing this morning the siding
for the house came and then at lunch time the drywall arrived.
The drywall came on a nice new fancy
truck. The back of the truck was almost to the road. The truck extended four
supports out its sides.
The black spot up on the top is
where the operator controls the boom.
Here comes the first bundle of drywall.
The operator places it into the
garage and another guy slides it off onto a cart to move to a far wall.
What a piece of equipment!
Some of the sheets were placed
inside the front door. The operator had no problem reaching the door opening.

No comments:
Post a Comment