For over a year effort has been put forth to assemble a team, raise funds and search for a location for a second Mr. Mai’s. For some strange reason, so I felt, the decision makers were leaning toward fixing up an old boat, that was rusting and rotting away and producing a layer of mold and a crop of mushrooms, for their second location.


I was asked to come for a look, since I was experienced in construction, and give my opinion. At my first look I wondered why they even considered it a remote possibility. In my opinion it was truly a disaster in the making for donors money. I felt even the location was questionable so the search continued.


Down the road three bus stops from the boat is a new development designed to attract people and businesses. There is also a university not far away and also our international school and team apartments. The location is on a main street with very good bus stops. Negotiations took place and a five year contract was worked out for space in the corner of the building on the right of the above picture.


It was a two story space with only one floor.


This space used to be two stories high, but now a second steel ceiling/floor has been installed with supports attached above to hold it up. Before long this space and the one above will be filled with chairs and tables. When the meeting took place with the designer and contractor a question was asked which I found quite amazing. They asked, “How long do you want this build out to last; one year, three or five?” When we responded, “Ten” they responded, “That will be very expensive!” So with a five year contract you try to keep it together while your contract is valid.


Just looking at the mess on the floor gives you some idea of our battle for quality here in China. The wall materials between the concrete columns are made out of old bricks from buildings that were torn down. The bricks are laid up with some mortar between them and then the surface is smoothed over with a layer or two of mortar. Instead of taking old building materials to a land fill someplace, they stack it up in new buildings and cover it up to form walls. Any building movement, and there is always some in these tall buildings, results in diagonal cracks in these walls. In my apartment, when I had one, all the walls had cracks in them.


Here is an opening for a stairway to the second floor. You can see three supports attached to the above ceiling used to hold up our second floor. I believe this steel floor will be a potential noise problem.


The above picture shows another view of our space. Food preparation will take place in the room behind the ladder.


A view of the upstairs showing the steel floor that will be very noisy if not covered with a carpet, which is not normally used here. I will try to get more pictures later to show their progress. Unfortunately it won’t be finished until after I return to the states, but I plan to spend some time having conversation with students when I return in the spring.


The above link is to a short article that is worth looking at.